Your production planning in the chemical industry is shaped by complex process chains, tank dependencies, and strict safety requirements.Lack of transparency regarding inventory levels, inbound flows, and constraints leads to short‑term rescheduling, inefficient resource utilization, and unreliable delivery dates.Typical symptoms include:
  • low planning reliability beyond a few hours
  • cost‑intensive downtime due to insufficient tank or material availability
  • high coordination effort between production, logistics, and dispatching
  • manual inventory and sequencing calculations
  • overtime and additional shifts to cover peak demand
  • reactive customer call‑offs due to lack of reliability
A capacity‑constrained, integrated production planning approach creates transparency, stability, and economic controllability.

Economic levers in the chemical industry


Production costs

  • Avoidance of unplanned downtime through transparent tank and material flow logic
  • Reduction of cost‑intensive cleaning and changeover sequences
  • Minimization of overtime as well as night and weekend shifts
  • Reduction of capital tied up through optimized raw material and intermediate inventory levels
  • Avoidance of unnecessary infrastructure or container expansions

planning and coordination effort

  • Reduction of manual coordination for plant start‑ups and shutdowns
  • Transparent coordination of batch and downstream processes
  • Automated calculation of inventory levels, coverage, and production sequences
  • Relief for key personnel through system‑supported decision logic
  • Elimination of time‑consuming workarounds in the event of short‑term changes

Integrated production planning for batch and continuous chemical processes

MCP’s industry‑specific solution extends Opcenter APS with capabilities for the safe and economically optimized control of chemical production processes.Recipes, batch sequences, tank allocations, cleaning logic, and delivery dates are consolidated into a consistent overall plan.The system calculates capacity‑constrained sequences, forecasts inventory levels across the planning horizon, and automatically takes safety and quality constraints into account.This creates forward‑looking production and logistics control – instead of reactive corrections in day‑to‑day operations.

  • Planning over several days instead of reactive hour‑by‑hour control
  • Relief for transport and dispatching processes
  • Automated reassessment in the event of disruptions or new demand
  • Transparent basis for decision‑making when adjusting capacities
  • More stable delivery commitments through reliable production forecasts
  • Sustainably high process quality – even in replacement scenarios
Hand mit blauer Schutzhandschuh hält Pipette über Reagenzgläsern mit blauer Flüssigkeit

Measurable impact in the chemical industry

Through integrated production and logistics planning, significant economic improvements can be achieved in chemical processes:

15%

higher productivity

25%

lower inventory levels

70%

reduced provision times

80%

fewer delivery delays

Mann im hellblauen Hemd sitzt nachdenklich vor einem Computerbildschirm mit einer Projektmanagement-Software und Gantt-Diagramm

Book your individual solution presentation

We will be happy to provide you with a comprehensive overview of the solution and its applicability in your factory:

  • production processes and boundary conditions
  • controllable cost drivers
  • Detailed functionality and mode of operation
  • Process quality and reliability
  • Solution architecture
  • Implementation methodology
  • References
Schedule a potential assessment

What changes for the planner?


The initial situation in the plant

In continuous or batch‑based processes, it is often not transparent which tank capacities, material flows, or transport routes will be available in the coming days.Planning reacts to bottlenecks at short notice instead of managing them proactively.Planning errors lead to downtime, schedule shifts, and increased coordination effort.A typical symptom is the short‑term reallocation of finished goods shortly before the scheduled delivery time due to incorrect prioritization.

Person mit Schutzhelm und Schutzkleidung hält ein Tablet vor einer Industrieanlage bei Dämmerung

With integrated APS planning, you gain:

  • Reliable production sequences several days in advance
  • Optimized batch and cleaning sequences taking all constraints into account
  • Transparent forecast of tank and container fill levels
  • Automatisierte Neubewertung des Gesamtplans bei Störungen innerhalb weniger Minuten
Laptop mit geöffnetem Bildschirm, auf dem eine Benutzeroberfläche mit mehreren Kacheln zu sehen ist, davor zwei Monitore mit Diagrammen und Tabellen
Hand in Hemdärmel hält Stift vor transparentem Bildschirm mit Gantt-Diagramm und Wochenübersicht

Success Story: Example from the process industry

A leading company in the process industry digitalized and fully integrated its production planning together with MCP. Result:

  • higher efficiency in production and logistics
  • significant relief for key personnel
  • Structured control of order management, tank allocation, and dispatching
The time saved in planning is now invested in strategic improvement initiatives to achieve annual productivity targets – further strengthening long‑term competitiveness.In the past, incoming orders were planned manually – including silo allocation, flushing batches, and contamination matrices. Today, we generate a complete, optimized plan for all plants within minutes, taking all constraints into account and ensuring stable plant operations.
Full success story

Your direct path to stable and economically efficient production planning

In a structured potential discussion, we analyze your specific challenges – and show you concretely what economic potential can realistically be unlocked in your production planning.
You will receive a well‑founded assessment of productivity, inventory, and service level potential, as well as the required implementation effort and project structure

Schedule a potential assessment
WordPress Cookie Notice by Real Cookie Banner
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.