Contents
Key points
- Maintenance is a capacity booking with a time window: it has to happen, but rarely to the exact hour.
- Opportunistic maintenance uses setup, cleaning and order gaps and so avoids additional downtime.
- If maintenance is postponed constantly, the risk of unplanned failures rises – particularly expensive at the bottleneck.
- An APS carries maintenance as a constraint with earliest and latest dates and plans orders around it.
- What matters is a clear conflict rule between production and maintenance and data exchange with the maintenance system.
Why do maintenance and production often plan against each other?
Maintenance and production pursue different goals and usually plan in separate systems: maintenance plans are created in the maintenance system, production plans in the ERP or APS. When the two meet, maintenance is postponed because the order seems more urgent – until an unplanned failure overturns the whole plan. At the bottleneck, every unplanned hour costs output for the whole plant.
Which types of maintenance exist?
Maintenance terminology is standardised in EN 13306. What matters for planning is how well the timing of a measure can be foreseen and moved.
| Type | Trigger | Plannability |
|---|---|---|
| Time-based preventive | Fixed interval by time or usage | High, with leeway in the window |
| Condition-based | Threshold of a measured condition, such as vibration | Medium, short lead time |
| Predictive | Forecast from condition data | Medium to high, depending on forecast quality |
| Corrective | Failure or breakdown | None – reaction only |
| Opportunistic | Opportunity such as setup, cleaning or an order gap | High, if maintenance and production are planned together |
How does maintenance become a plannable constraint?
Maintenance becomes plannable when it is carried like an order with duration, resource and time window: earliest and latest date, maintenance staff with the required skills and spare parts. Within the window, planning may move the maintenance; after the latest date it may not.
Rule of thumb: fixed blocks only where the date really is fixed – for external service providers or mandatory inspections, for example. Everything else is planned as a movable window.
What is opportunistic maintenance?
Opportunistic maintenance places measures in times when the line is stopped anyway: during cleaning, a product changeover or an order gap. No additional downtime arises. The prerequisite is that the maintenance fits into the gap, maintenance staff are available and the spare parts are in stock – exactly what planning has to check jointly.
Which data does joint planning need?
- Maintenance orders with duration, earliest and latest date and line reference.
- Maintenance staff with skills, including contractors.
- Spare parts and their availability.
- Condition data, where maintenance is condition-based or predictive.
- Feedback on whether maintenance is complete – otherwise the system plans against a wrong line state.
The data usually comes from the maintenance system and is taken over through an interface – see integrating APS, ERP and MES.
Who decides in conflicts?
A simple division has proved its worth: within the maintenance window, production planning decides the exact timing; maintenance decides the latest date. If a window is repeatedly used to the limit, that signals too little capacity – not overly strict maintenance. Useful metrics are the share of unplanned downtime, maintenance schedule adherence and the number of postponements.
What does an APS contribute to maintenance planning?
An APS plans maintenance as a constraint in the same run as the orders. It places it preferably in setup and cleaning windows, shows conflicts early and protects the available time at the bottleneck – see bottleneck planning. In Siemens Opcenter APS, the maintenance block from the MCP component set takes on this task.
How much downtime could move into setup windows?
We analyse your maintenance and production plans together and show which maintenance can be moved into setup, cleaning or order gaps and how much line time that frees up.
Frequently asked questions on maintenance in production planning
Maintenance is the umbrella term. According to DIN 31051 it comprises servicing, inspection, repair and improvement; servicing only covers measures that slow down wear, such as lubricating, cleaning and adjusting.
By having the forecast create a maintenance window instead of a fixed date. Planning then places the measure in a suitable gap before the forecast time of failure.
Only if the line is stopped at the weekend anyway or the maintenance takes longer than any gap in the plan. Otherwise, setup and cleaning windows during the week are usually cheaper because no premiums apply.
A maintenance window is the period between the earliest and latest permitted date of a maintenance task. Within the window, planning can choose the timing freely; outside it cannot.
Maintenance maintains windows, duration and resources in the maintenance system; the APS takes them over via an interface. The maintenance system thus remains the source of record and there is no duplicate maintenance.
Sources and notes
- DIN 31051:2019 – Fundamentals of maintenance (division into servicing, inspection, repair and improvement).
- EN 13306:2018 – Maintenance – Maintenance terminology.
- ISO 55000:2024 – Asset management – Vocabulary, overview and principles.
Related articles: Bottleneck planning · Campaign formation and cleaning optimisation · Working with an APS system
An overview of selection and implementation is given in the guide production planning software; all articles are listed under end-to-end planning.
For manufacturers
Where is the biggest lever in your planning?
Every production operation plans differently. Let’s look at your process together: where do bottlenecks occur today, which use case offers the greatest leverage, and what results can realistically be achieved?
Book a potential analysisDaniel Walkiewicz
Daniel Walkiewicz is a Partner at MCP Algorithm Factory, where he is responsible for detailed production scheduling and APS process consulting. He has been implementing planning projects at MCP since 2010. As a company, MCP has put more than 300 planning projects into operation and runs one of the largest Opcenter APS teams in Europe.